<?xml version='1.0' encoding='UTF-8'?><?xml-stylesheet href="http://www.blogger.com/styles/atom.css" type="text/css"?><feed xmlns='http://www.w3.org/2005/Atom' xmlns:openSearch='http://a9.com/-/spec/opensearchrss/1.0/' xmlns:georss='http://www.georss.org/georss' xmlns:gd='http://schemas.google.com/g/2005' xmlns:thr='http://purl.org/syndication/thread/1.0'><id>tag:blogger.com,1999:blog-765123228200171826</id><updated>2011-04-21T21:09:07.757-07:00</updated><title type='text'>To Suzanne Folsom Director INT</title><subtitle type='html'></subtitle><link rel='http://schemas.google.com/g/2005#feed' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/posts/default'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default?max-results=100'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/'/><link rel='hub' href='http://pubsubhubbub.appspot.com/'/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><generator version='7.00' uri='http://www.blogger.com'>Blogger</generator><openSearch:totalResults>5</openSearch:totalResults><openSearch:startIndex>1</openSearch:startIndex><openSearch:itemsPerPage>100</openSearch:itemsPerPage><entry><id>tag:blogger.com,1999:blog-765123228200171826.post-1917238260939746350</id><published>2007-08-29T04:04:00.000-07:00</published><updated>2007-08-29T04:04:54.998-07:00</updated><title type='text'>Open Letter to Ms. Suzanne Folsom, Director, Department of Institutional Integrity</title><content type='html'>&lt;p class="MsoNormal" style="text-align: right;" align="right"&gt;&lt;span lang="EN-US"&gt;29&lt;sup&gt;th&lt;/sup&gt; August 2007&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Ms. Suzanne Folsom, Director&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="color: black;" lang="EN-US"&gt;Department of Institutional Integrity (INT) &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="color: black;" lang="EN-US"&gt;The World Bank &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:address st="on"&gt;&lt;span style="color: black;" lang="EN-US"&gt;1818 H Street NW&lt;/span&gt;&lt;/st1:address&gt;&lt;span style="color: black;" lang="EN-US"&gt;, MC8-754 &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;&lt;span style="color: black;" lang="EN-US"&gt;Washington&lt;/span&gt;&lt;/st1:City&gt;&lt;span style="color: black;" lang="EN-US"&gt;, &lt;st1:state st="on"&gt;DC&lt;/st1:State&gt; &lt;st1:postalcode st="on"&gt;20433&lt;/st1:PostalCode&gt;&lt;/span&gt;&lt;/st1:place&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Re: The case of Mr. Bruce Tasker&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Dear Ms. Folsom,&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;It is the sixth month since the Government Accountability Project (GAP) submitted a&lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/government-accountability-project.html"&gt; &lt;b&gt;Demand Letter&lt;/b&gt; &lt;/a&gt;&lt;span style=""&gt; &lt;/span&gt;to your office on my behalf, requesting your prompt response to the matter of my claim and looking forward to hearing from you within ten business days. I am informed by GAP that its senior staffs have contacted your office on a number of occasions, and although they have been verbally informed that the INT apparently intends to carry out a full investigation into the matter, no formal information has been received about when and how that should happen. So GAP recently sent a second letter asking for the latest status with the claim.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;It is three months since Her Majesty’s Ambassador of the British Embassy in Armenia sent a &lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/british-government-support.html"&gt;&lt;b&gt;letter&lt;/b&gt; &lt;/a&gt;to you personally, explaining that, as the INT has been aware of this matter since June 2004, and as the details are comprehensively documented, he hoped that your enquiries could be concluded expeditiously in order to bring the matter to a timely and appropriate conclusion. More than two months later, the Ambassador had not received a reply to his letter. So he wrote to the World Bank UK representation in &lt;st1:place st="on"&gt;&lt;st1:state st="on"&gt;Washington&lt;/st1:State&gt;&lt;/st1:place&gt;, and asked them to look into the matter. The Ambassador is waiting for a response.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;You are aware that details of my claim have been forwarded to the Foreign and Commonwealth Office in the &lt;st1:country-region st="on"&gt;UK&lt;/st1:country-region&gt;, and the matter is being monitored by the &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;UK&lt;/st1:country-region&gt;&lt;/st1:place&gt;’s &lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/serious-fraud-squad.html"&gt;&lt;b&gt;Serious Fraud Office&lt;/b&gt;.&lt;/a&gt; In that respect, a senior official of the British Embassy in &lt;st1:place st="on"&gt;&lt;st1:state st="on"&gt;Washington&lt;/st1:State&gt;&lt;/st1:place&gt; has contacted the INT on more than one occasion to enquire about how your department is proceeding with the claim. But information has not been forthcoming.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;The &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;UK&lt;/st1:place&gt;&lt;/st1:country-region&gt; is a major contributor to the World Bank, and the British Government is interested to know that its funds are being used effectively.&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;The INT continually gives assurances that a fair, prompt and thorough review of the facts and circumstances regarding reports of misconduct will be carried out. But not only has the INT made no formal commitment to carry out an investigation, it has not responded to any of the efforts to seek information about the matter.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;This open letter therefore repeats what has been asked by a number of high-ranking Governmental and Non-Governmental officials, that you please advise when and how the Department of Institutional Integrity will be carrying out a full investigation, in response to GAP’s 29&lt;sup&gt;th&lt;/sup&gt; March Demand Letter, submitted to your office on my behalf.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Yours Sincerely,&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="font-size: 14pt; font-family: &amp;quot;Kunstler Script&amp;quot;;" lang="EN-US"&gt;Bruce Tasker&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="line-height: 15pt;"&gt;&lt;span lang="EN-US"&gt;Senior Specialist and Analyst&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="line-height: 15pt;"&gt;&lt;span lang="EN-US"&gt;Parliamentary Commission&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="line-height: 15pt;"&gt;&lt;st1:place st="on"&gt;&lt;st1:placetype st="on"&gt;&lt;span lang="EN-US"&gt;Republic&lt;/span&gt;&lt;/st1:PlaceType&gt;&lt;span lang="EN-US"&gt; of &lt;st1:placename st="on"&gt;Armenia&lt;/st1:PlaceName&gt;&lt;/span&gt;&lt;/st1:place&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="text-align: center;" align="center"&gt;&lt;span lang="EN-US"&gt;Full details about the claim can be seen on &lt;a href="http://better-not-wb-the-wb.blogspot.com/"&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/a&gt;&lt;a href="http://better-not-wb-the-wb.blogspot.com/"&gt;&lt;b&gt;'Blowing the World Bank Whistle'&lt;/b&gt;&lt;/a&gt;&lt;/span&gt;&lt;span style=""&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/765123228200171826-1917238260939746350?l=to-suzanne-folsom-director-int.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/1917238260939746350/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='http://www.blogger.com/comment.g?blogID=765123228200171826&amp;postID=1917238260939746350' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/1917238260939746350'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/1917238260939746350'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/2007/08/open-letter-to-ms-suzanne-folsom.html' title='Open Letter to Ms. Suzanne Folsom, Director, Department of Institutional Integrity'/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-765123228200171826.post-1663387295042158005</id><published>2007-08-27T20:48:00.006-07:00</published><updated>2007-08-28T04:37:29.667-07:00</updated><title type='text'>Open Letter to Ms. Suzanne Folsom</title><content type='html'>&lt;p class="MsoNormal" style="text-align: right;" align="right"&gt;&lt;span lang="EN-US"&gt;29&lt;sup&gt;th&lt;/sup&gt; August 2007&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Ms. Suzanne Folsom, Director&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span  lang="EN-US" style="color:black;"&gt;Department of Institutional Integrity (INT) &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span  lang="EN-US" style="color:black;"&gt;The World Bank &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:address st="on"&gt;&lt;span  lang="EN-US" style="color:black;"&gt;1818 H Street NW&lt;/span&gt;&lt;/st1:address&gt;&lt;span  lang="EN-US" style="color:black;"&gt;, MC8-754 &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;&lt;span  lang="EN-US" style="color:black;"&gt;Washington&lt;/span&gt;&lt;/st1:city&gt;&lt;span  lang="EN-US" style="color:black;"&gt;, &lt;st1:state st="on"&gt;DC&lt;/st1:state&gt; &lt;st1:postalcode st="on"&gt;20433&lt;/st1:postalcode&gt;&lt;/span&gt;&lt;/st1:place&gt;&lt;span  lang="EN-US" style="color:black;"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Re: The case of Mr. Bruce Tasker&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Dear Ms. Folsom,&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;It is now exactly six months since the Government Accountability Project (GAP) submitted a&lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/government-accountability-project.html"&gt; &lt;b style=""&gt;&lt;u&gt;Demand Letter&lt;/u&gt;&lt;/b&gt; &lt;/a&gt;on my behalf to your office, requesting your prompt response to the matter and looking forward to hearing from you within ten business days. &lt;/span&gt;&lt;span style="" lang="EN-US"&gt;GAP informs me that through the past six months, its senior staffs have contacted your office on a number of occasions, and although they have been informed that the INT apparently intends to carry out a full investigation into the allegations, no formal reply has been received.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;    &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;It is four months since Her Majesty’s Ambassador of the British Embassy in Armenia sent a &lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/british-government-support.html"&gt;&lt;b style=""&gt;&lt;u&gt;letter&lt;/u&gt;&lt;/b&gt; &lt;/a&gt;to you personally, explaining that, as the INT has been aware of this matter since June 2004, and the details are comprehensively documented, he hoped that your enquiries could be concluded expeditiously in order to bring the matter to a timely and appropriate conclusion.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;You are also aware that details of the allegations have been forwarded to the British Foreign and Commonwealth Office, and the matter is being monitored by the &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;UK&lt;/st1:country-region&gt;&lt;/st1:place&gt;’s &lt;a href="http://to-suzanne-folsom-director-int.blogspot.com/2007/08/serious-fraud-squad.html"&gt;&lt;b style=""&gt;&lt;u&gt;Serious Fraud Office&lt;/u&gt;&lt;/b&gt;.&lt;/a&gt; In that respect, a senior official of the British Embassy in &lt;st1:place st="on"&gt;&lt;st1:state st="on"&gt;Washington&lt;/st1:state&gt;&lt;/st1:place&gt; has contacted the INT on more than one occasion to enquire about how your department is proceeding with the matter. The &lt;st1:country-region st="on"&gt;UK&lt;/st1:country-region&gt; representation at the World Bank in &lt;st1:state st="on"&gt;&lt;st1:place st="on"&gt;Washington&lt;/st1:place&gt;&lt;/st1:state&gt; has also been asked to make enquiries into the matter, and the British Ambassador has recently sent a second letter, in which he repeats that request. But there has been no response.&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;The &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;UK&lt;/st1:place&gt;&lt;/st1:country-region&gt; is a major contributor to the World Bank, and the British Government is of course keen to know that its funds are being used effectively.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Today, six months after &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;the &lt;/span&gt;&lt;span style="" lang="EN-US"&gt;submission of GAP’s Demand Letter to your office, the INT has made no formal commitment to carry out the investigation that has been requested, and so GAP sent a letter asking for the latest status with the claim. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;This open letter is a personal request, that you please advise how and when the Department of Institutional Integrity will be carrying out a full investigation, in response to the Demand Letter submitted on my behalf to your office, 29&lt;sup&gt;th&lt;/sup&gt; March this year.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;br /&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Yours Sincerely,&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;  &lt;/p&gt;&lt;p class="MsoNormal"&gt;  &lt;/p&gt;  &lt;p class="MsoNormal"&gt;  &lt;/p&gt;&lt;p class="MsoNormal"&gt;  &lt;/p&gt;&lt;p class="MsoNormal"&gt;&lt;span style="font-size: 14pt; font-family: &amp;quot;Kunstler Script&amp;quot;;" lang="EN-US"&gt;Bruce Tasker&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;      &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;Senior Specialist&lt;/span&gt;&lt;span style="" lang="EN-US"&gt; and &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Analyst&lt;/span&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Armenian Parliamentary Commission&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;    &lt;p style="text-align: center;" class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Full details about the claim can be seen on &lt;a href="http://better-not-wb-the-wb.blogspot.com/"&gt;&lt;span style="font-weight: bold;"&gt;&lt;br /&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style="text-align: center;" class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;a href="http://better-not-wb-the-wb.blogspot.com/"&gt;&lt;span style="font-weight: bold;"&gt;'Blowing the World Bank Whistle'&lt;/span&gt;&lt;/a&gt;&lt;br /&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;br /&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/765123228200171826-1663387295042158005?l=to-suzanne-folsom-director-int.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/1663387295042158005/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='http://www.blogger.com/comment.g?blogID=765123228200171826&amp;postID=1663387295042158005' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/1663387295042158005'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/1663387295042158005'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/2007/08/open-letter-to-ms-suzanne-folsom_27.html' title='Open Letter to Ms. Suzanne Folsom'/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-765123228200171826.post-3329047599931392003</id><published>2007-08-27T20:48:00.003-07:00</published><updated>2007-08-28T02:07:16.908-07:00</updated><title type='text'>From the British Ambassador in Armenia</title><content type='html'>&lt;div style="text-align: left;"&gt;&lt;span style="font-weight: bold;"&gt;Letter from Ambassador Cantor&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;span style=""&gt;&lt;br /&gt;&lt;/span&gt;&lt;/span&gt;&lt;/div&gt;&lt;div style="text-align: right;"&gt;   &lt;/div&gt;&lt;p class="MsoNormal" style="background: white none repeat scroll 0% 50%; -moz-background-clip: -moz-initial; -moz-background-origin: -moz-initial; -moz-background-inline-policy: -moz-initial; text-align: right;"&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;span style=""&gt;34 Baghramyan Avenue,&lt;br /&gt;Yerevan 375019&lt;br /&gt;&lt;/span&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;span style=""&gt;Armenia&lt;/span&gt;&lt;br /&gt;Tel: &lt;span style=""&gt;374 (10) 26-43-01&lt;/span&gt;&lt;br /&gt;Fax: &lt;span style=""&gt;374 (10) 26-43-18&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class="MsoNormal" style="background: white none repeat scroll 0% 50%; -moz-background-clip: -moz-initial; -moz-background-origin: -moz-initial; -moz-background-inline-policy: -moz-initial; text-align: right;"&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;span style=""&gt;&lt;/span&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;E-mail:   Tony.Cantor@fco.gov.uk&lt;/span&gt;&lt;br /&gt;&lt;/p&gt;&lt;br /&gt; &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;29 May 2007&lt;o:p&gt;&lt;br /&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;            &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;Ms Suzanne Folsom&lt;br /&gt;Director&lt;br /&gt;Department of Institutional Integrity (INT)&lt;br /&gt;The World Bank&lt;/span&gt;&lt;/strong&gt;&lt;br /&gt;&lt;st1:address st="on"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;1818 H Street NW&lt;/span&gt;&lt;/strong&gt;&lt;/st1:address&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;, MC8-754&lt;/span&gt;&lt;/strong&gt;&lt;br /&gt;&lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;Washington&lt;/span&gt;&lt;/strong&gt;&lt;/st1:city&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt; &lt;st1:state st="on"&gt;DC&lt;/st1:state&gt; &lt;st1:postalcode st="on"&gt;20433&lt;/st1:postalcode&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/st1:place&gt;&lt;br /&gt;&lt;/p&gt;&lt;p class="MsoNormal"&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;Dear Ms Folsom&lt;o:p&gt;&lt;br /&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;I am writing to draw your attention to a case being investigated by INT, in response to a claim by a British national, Mr Bruce Tasker, whose legal counsel is the Government Accountability Project (GAP) of the &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;USA&lt;/st1:country-region&gt;&lt;/st1:place&gt;. &lt;/span&gt;&lt;/strong&gt;&lt;b style=""&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;Mr Tasker has been involved in development projects in &lt;st1:country-region st="on"&gt;Armenia&lt;/st1:country-region&gt; for a number of years and also worked for a Parliamentary Commission which reported allegations of corruption in World Bank projects in &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;Armenia&lt;/st1:country-region&gt;&lt;/st1:place&gt;. As INT has been aware of his case since June 2004, and the details are comprehensively documented, I hope that your enquiries can be concluded expeditiously in order to bring this matter to a timely and appropriate conclusion.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;        &lt;p class="MsoNormal"&gt;&lt;strong&gt;&lt;span style="font-weight: normal;font-family:Arial;"  lang="EN-GB"&gt;Yours sincerely&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/strong&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;&lt;o:p&gt;&lt;br /&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span  lang="EN-GB" style="font-family:Arial;"&gt;Anthony Cantor&lt;br /&gt;Ambassador&lt;/span&gt;&lt;br /&gt;&lt;/p&gt;&lt;span style=""&gt;&lt;/span&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/765123228200171826-3329047599931392003?l=to-suzanne-folsom-director-int.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/3329047599931392003/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='http://www.blogger.com/comment.g?blogID=765123228200171826&amp;postID=3329047599931392003' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/3329047599931392003'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/3329047599931392003'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/2007/08/british-government-support.html' title='From the British Ambassador in Armenia'/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-765123228200171826.post-834589516842973258</id><published>2007-08-27T20:47:00.003-07:00</published><updated>2007-08-28T02:08:20.291-07:00</updated><title type='text'>The Serious Fraud Squad</title><content type='html'>&lt;span style="font-weight: bold;"&gt;Message from the UK Foreign &amp; Commonwealth Office&lt;/span&gt;&lt;br /&gt;&lt;b&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;&lt;br /&gt;Ms. Joanna Kuenssberg&lt;/span&gt;&lt;/b&gt;&lt;span style="" lang="EN-GB"&gt; &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;Business Team Leader&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;Sustainable Development and Business Group&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;Foreign &amp;amp; Commonwealth Office&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;King Charles Street&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;LONDON SW1A 2AH&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;tel:  +44 (0)20 7008 2682&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;fax: +44 (0)20 7008 3905 &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span  lang="EN-GB" style="font-family:Georgia;"&gt;22nd June 2007&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style=";font-family:Georgia;color:purple;"   lang="EN-GB"&gt;jo.kuenssberg@fco.gov.uk&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;br /&gt;&lt;/span&gt;&lt;span style=";font-family:Georgia;color:purple;"   lang="EN-GB"&gt;www.fco.gov.uk&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;Dear Mr Tasker&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt; &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;The Serious Fraud Office is the British law enforcement agency responsible for vetting all allegations of corruption against &lt;st1:country-region st="on"&gt;UK&lt;/st1:country-region&gt; nationals and &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;UK&lt;/st1:place&gt;&lt;/st1:country-region&gt; companies in relation to Part 12 of the Anti-Terrorism, Crime and Security Act of 2001. The SFO is assessing the material to decide what further investigative action might be taken.................................. &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt; &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style=""&gt;Regards,&lt;/span&gt;&lt;span style=""&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style=""&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;span style=""&gt;Jo Kuenssberg&lt;/span&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/765123228200171826-834589516842973258?l=to-suzanne-folsom-director-int.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/834589516842973258/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='http://www.blogger.com/comment.g?blogID=765123228200171826&amp;postID=834589516842973258' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/834589516842973258'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/834589516842973258'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/2007/08/serious-fraud-squad.html' title='The Serious Fraud Squad'/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-765123228200171826.post-3136590863763902960</id><published>2007-08-27T12:44:00.000-07:00</published><updated>2007-08-27T12:46:38.337-07:00</updated><title type='text'></title><content type='html'>&lt;p class="MsoNormal" style="text-align: center;" align="center"&gt;&lt;b&gt;&lt;span style="font-size: 16pt; font-family: &amp;quot;BankGothic Md BT&amp;quot;;" lang="EN-US"&gt;Government Accountability Project&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="text-align: center;" align="center"&gt;&lt;span style="font-family: &amp;quot;BankGothic Md BT&amp;quot;;" lang="EN-US"&gt;National Office&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: -36pt; text-align: center;" align="center"&gt;&lt;st1:street st="on"&gt;&lt;st1:address st="on"&gt;&lt;span style="font-family: &amp;quot;BankGothic Md BT&amp;quot;;" lang="EN-US"&gt;1612 K Street, NW Suite #1100&lt;/span&gt;&lt;/st1:address&gt;&lt;/st1:Street&gt;&lt;span style="font-family: &amp;quot;BankGothic Md BT&amp;quot;;" lang="EN-US"&gt; • &lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;Washington&lt;/st1:City&gt;, &lt;st1:state st="on"&gt;D.C.&lt;/st1:State&gt; &lt;st1:postalcode st="on"&gt;20006&lt;/st1:PostalCode&gt;&lt;/st1:place&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: -36pt; text-align: center;" align="center"&gt;&lt;span style="font-family: &amp;quot;BankGothic Md BT&amp;quot;;" lang="EN-US"&gt;202.408.0034 • &lt;u&gt;&lt;span style="color: blue;"&gt;&lt;a href="http://www.whistleblower.org/" title="http://www.whistleblower.org/"&gt;www.whistleblower.org&lt;/a&gt;&lt;/span&gt;&lt;/u&gt;&lt;/span&gt;&lt;u&gt;&lt;span style="color: blue;" lang="EN-US"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/p&gt;  &lt;div style="border-style: none none solid; border-color: -moz-use-text-color -moz-use-text-color windowtext; border-width: medium medium 1.5pt; padding: 0cm 0cm 1pt; margin-left: -36pt; margin-right: 0cm;"&gt;  &lt;p class="MsoNormal" style="border: medium none ; padding: 0cm; text-align: center;" align="center"&gt;&lt;b&gt;&lt;span style="color: black;" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;p class="MsoNormal" style="text-align: right;" align="right"&gt;&lt;span lang="EN-US"&gt;March 29, 2007&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Suzanne Folsom, Director&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="color: black;" lang="EN-US"&gt;Department of Institutional Integrity (INT) &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="color: black;" lang="EN-US"&gt;The World Bank &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:address st="on"&gt;&lt;span style="color: black;" lang="EN-US"&gt;1818 H Street NW&lt;/span&gt;&lt;/st1:address&gt;&lt;span style="color: black;" lang="EN-US"&gt;, MC8-754 &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;&lt;span style="color: black;" lang="EN-US"&gt;Washington&lt;/span&gt;&lt;/st1:City&gt;&lt;span style="color: black;" lang="EN-US"&gt;, &lt;st1:state st="on"&gt;DC&lt;/st1:State&gt; &lt;st1:postalcode st="on"&gt;20433&lt;/st1:PostalCode&gt;&lt;/span&gt;&lt;/st1:place&gt;&lt;span style="color: black;" lang="EN-US"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Re: The case of Mr. Bruce Tasker&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Dear Ms. Folsom: &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;We are legal counsel for Mr. Bruce Tasker, a &lt;span style=""&gt;systems engineer and business development consultant, and 12-year resident of &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;Armenia&lt;/st1:country-region&gt;&lt;/st1:place&gt;.&lt;span style=""&gt;  &lt;/span&gt;From September, 2003 to December, 2004, Mr. Tasker was employed by the Parliament of Armenia as a specialist on the Commission to Study Credits, Grants, and Humanitarian Assistance received from foreign countries and intergovernmental organizations (CGHA Commission).&lt;span style=""&gt;  &lt;/span&gt;The CGHA Commission was established to examine the parameters of external support to the government of &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;Armenia&lt;/st1:place&gt;&lt;/st1:country-region&gt; after the country’s independence in 1991. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Mr. Tasker has retained our services for the purposes of clarifying disclosures of misconduct he made concerning private and public sector officials implementing a World Bank funded project as part of his report to the Parliament of Armenia.&lt;span style=""&gt;  &lt;/span&gt;His investigation on behalf of the &lt;/span&gt;&lt;span style="" lang="EN-US"&gt;CGHA Commission&lt;/span&gt;&lt;span lang="EN-US"&gt; revealed widespread corruption associated with this project and these officials.&lt;span style=""&gt;  &lt;/span&gt;He maintains that as a result of his disclosures, World Bank officials have “blacklisted” him from participating in future World Bank-funded projects.&lt;span style=""&gt;  &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The Government Accountability Project (GAP) is a nonprofit public interest group that promotes accountability by advancing occupational free speech and defending employees and citizens who expose wrongdoing in their governments or in the organizations for which they work.&lt;span style=""&gt;  &lt;/span&gt;Mr. Tasker’s disclosures about corruption in the World Bank-funded Municipal Development Project (MDP) in Yerevan, Armenia, and the resulting reaction of the World Bank’s Department of Institutional Integrity (INT) are deeply disturbing, especially in light of the fact that the corruption outlined by Mr. Tasker is potentially ongoing.&lt;span style=""&gt;  &lt;/span&gt;Despite Mr. Tasker’s well-documented disclosure, no effective action has been taken by the Bank to safeguard the project and its funds. On the contrary, steps have been taken to suppress Mr. Tasker’s report, silence him, and harm his reputation and career in the development community.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b&gt;&lt;u&gt;&lt;span lang="EN-US"&gt;Chronology of Events&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The Parliament of Armenia established the CGHA Commission in September, 2003, and the Speaker of Parliament appointed Mr. Tasker Senior Specialist and Analyst.&lt;span style=""&gt;   &lt;/span&gt;In November, CGHA Commission members determined that the examination of specific loans and projects fell within their scope of work and in January 2004 they included the MDP as one of operations to be studied.&lt;span style=""&gt;  &lt;/span&gt;Specifically, the MDP was included in the Commission’s review as the result of a communication received on November 10&lt;sup&gt;th&lt;/sup&gt;, 2003.&lt;span style=""&gt;  &lt;/span&gt;In a letter, Betartshin, a local construction company, alleged improper exclusion from a bidding process held under the auspices of MDP.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The MDP included six components: an immediate investment program, a private sector management contract, an operating investment fund, capital investments, housing and technical assistance.&lt;span style=""&gt;  &lt;/span&gt;The total project cost was US$ 35.5 million.&lt;span style=""&gt;  &lt;/span&gt;The World Bank, through its low-interest loan window for poor countries, the International Development Association (IDA), provided US$30 million of this sum, and the Government of Armenia contributed US$ 5.5 million.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The World Bank provided the funds through a credit agreement with the Government of Armenia, represented by the Ministry of Finance (Borrower) (now the Ministry of Finance &amp; Economy) and a sub-credit agreement between the Borrower and the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Yerevan Water &amp;amp; Sewerage Company (YWSC) &lt;/span&gt;&lt;span lang="EN-US"&gt;(Beneficiary) (&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;at the time of project implementation the Yerevan Water &amp; Sewerage &lt;i style=""&gt;Enterprise&lt;/i&gt; [YWSE]) &lt;/span&gt;&lt;span lang="EN-US"&gt;facilitated transfer of funds to the Beneficiary. The Credit Agreement required a Security Agreement between the Borrower and the Beneficiary, under which the Beneficiary would pledge all its assets as security against the loan. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;During the month of January, 2004, Mr. Tasker held a series of meetings with project officials representing the Yerevan Water and Sewerage Company (YWSC), including Mr. Richard Walkling, the Authorized Representative of ACEA &amp; Company Armenian Utility S.C.A.R.L. (A. utilities), the International Operator (ARIO); Mr. Andronik Oganessyan, presented as the Executive Director of YWSC at the time; and Mr. Varazdat Avoyan, Director of the MDP Project Management Unit (MDPMU).&lt;span style=""&gt;  &lt;/span&gt;In a meeting on January 9&lt;sup&gt;th&lt;/sup&gt; with Mr. Walkling, Mr. Tasker requested information about the Betartshin complaint and other contracts affected by the MDP.&lt;span style=""&gt;  &lt;/span&gt;Little information was forthcoming. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Through multiple inquiries and meetings, and a study of documents, Mr. Tasker and the CGHA Commission established that the PMU of the MDP had not been properly registered with the Government of Armenia at the time of signing the project sub-credit agreement.&lt;span style=""&gt;  &lt;/span&gt;Further, the Commission found that although the MDP credit with the World Bank stipulated that the PMU must be registered and staffed prior to World Bank disbursal of funds, the disbursal occurred without a legally registered PMU. &lt;span style=""&gt; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;It later became apparent that the Authorized Representative of the International Operator (ARIO) had been appointed as the General Director of the YWSC. In effect, Mr. Tasker found that, although the International Operator was party to a Performance Based Management Contract with the YWSC to manage in-country works under the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project, their Authorised Representative &lt;/span&gt;&lt;span lang="EN-US"&gt;was implementing the project as General Director of the Yerevan Water and Sewerage Company.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Mr. Tasker, in his report, showed that the Government of Armenia, through its Ministry of Finance, had in fact obtained a credit from the World Bank through the signing of falsified document, signed by the Director of a non-existent PMU and endorsed with a counterfeit stamp.&lt;span style=""&gt;  &lt;/span&gt;Moreover, Mr. Tasker and the CGHA Commission demonstrated to Mr. Roger Robinson, the World Bank Country Manager (WBCM) through a presentation at a meeting at the National Assembly on February 27&lt;sup&gt;th&lt;/sup&gt;, 2004 that: a) the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project&lt;/span&gt;&lt;span lang="EN-US"&gt; sub-credit agreement included a counterfeit stamp of a non-existent Project Management Unit; that b) Mr. Walkling, the ARIO, had been appointed as the General Director of the YWSC, creating a conflict of interest; and that c) the security agreement between the Borrower (the Ministry of Finance) and the Beneficiary YWSC had not been established.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Although Mr. Walkling’s conflict of interest was not illegal, it nonetheless contravened the requirements of the management contract between the Operator and the YWSC and created a convergence of authority through which he, as the ARIO, became a central figure in wide-ranging project related corruption, including a campaign to embezzle public funds.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;In the absence of an effective and independent management unit Operator, the MDP had been implemented in the interests of its various authorities, rather than in compliance with its original objectives for the benefit of the population of &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;.&lt;span style=""&gt;  &lt;/span&gt;The prime objectives of the MDP originally had been to a) refurbish the &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt; water pipeline infrastructure and improve the reliability of water to the residents and businesses of the service area, and b) reduce the high cost of electricity, including that required to pump water to multi-story apartment blocks.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;However, through agreement between the Operator, the YWSC, and the fraudulent MDPMU, and with authorization from the Armenia State Water Committee, the objectives of the project had been changed.&lt;span style=""&gt;  &lt;/span&gt;The project was now funding the installation of water monitoring and domestic water metering systems.&lt;span style=""&gt;  &lt;/span&gt;This change afforded contractors opportunities to generate profits by appropriating nearly US$ 10 on the sale of each meter.&lt;span style=""&gt;  &lt;/span&gt;In nearly all cases, customers were obliged to pay for the meters, pay for and arrange installation and fund the additional cost of fixtures and fittings. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;In 2002 an intensive domestic water meter program required subscribers to have water meters installed, and by 2004, the Yerevan Water &amp; Sewerage Company had registered 289,000 water customers. The YWSC General Director confirmed that the average number of water meters per customer is 1.5, which extrapolates to 433,500 domestic water meters installed, with a total sales value of more than $6,500,000.&lt;span style=""&gt;  &lt;/span&gt;Nowhere in the 2003 YWSC Financial Statements provided to the Commission were profits or cash flow income forecast resulting from the sale of water meters mentioned.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;This shift in operations was not simply a fraud perpetrated to benefit specific individuals, but it damaged the overall plan to repair the water system of &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;.&lt;span style=""&gt;  &lt;/span&gt;By metering water and charging for it, customers were motivated to close their taps, increasing water pressure in the system, and the YWSC used this opportunity in an attempt to eliminate the use of Booster Pumps, which are needed to increase the water pressure for delivery to high-rise apartment buildings.&lt;span style=""&gt;  &lt;/span&gt;Because the pipelines had not been renovated as specified, they could not withstand the additional pressure and they developed increasingly serious breaks and leaks.&lt;span style=""&gt;  &lt;/span&gt;Had the original objectives been followed, the pipes would have been repaired first, allowing the upgraded parts of the system to tolerate the increased pressure occasioned by metering, and the breakdown that occurred in those parts could have been substantially avoided. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;In reviewing the shift in project objectives, the CGHA Commission and Mr. Tasker also found that the shift from pipeline replacement and renovation to meter installation did not comply with the original objectives and targets in the Management Contract.&lt;span style=""&gt;  &lt;/span&gt;As a result, the Operator could not meet performance targets and stood to lose an Incentive Compensation.&lt;span style=""&gt;  &lt;/span&gt;In order to avoid the loss, an amendment to the contract was signed, dramatically lowering the performance standard the Operator had to meet to qualify for the bonus. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;At about the same time, the CGHA Commission found that another activity, also completed under the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project, used sub-standard materials&lt;/span&gt;&lt;span lang="EN-US"&gt;.&lt;span style=""&gt;  &lt;/span&gt;Under review it became evident that a local company, under local procurement terms, installed used pipes in the construction of a 4,000 cubic meter water reservoir in &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;.&lt;span style=""&gt;  &lt;/span&gt;Moreover, the pipes were taken from the steam system of a disused chemical factory, and would typically have been sold for scrap, .&lt;/span&gt;&lt;span style="" lang="EN-US"&gt; &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;span style=""&gt; &lt;/span&gt;Instead, they &lt;/span&gt;&lt;span lang="EN-US"&gt;were used to connect the new reservoir to the water mains. The head of the CGHA Commission showed photographs of the deteriorated pipes to the National Assembly in a presentation made March 30&lt;sup&gt;th&lt;/sup&gt;, 2004.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;To address this issue, Mr. Walkling presented a ledger of more than 100 contracts and work orders to the CGHA Commission, providing details&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt; of what had been done with the pipes that were &lt;/span&gt;&lt;span lang="EN-US"&gt;bought for the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project&lt;/span&gt;&lt;span lang="EN-US"&gt;. The Head of Commission invited the Parliament’s lawyer to give his opinion on the documents submitted, and the lawyer confirmed that they were all falsified and/or counterfeit. The ledger has been filed in the archives of the National Assembly, together with other original documents gathered for the study.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;On June 16&lt;sup&gt;th&lt;/sup&gt;, 2004, the CGHA Commission began a study of YWSC finances and found questionable circumstances surrounding the transfer of an energy debt from YSWC to Haigasart and other aspects of the Government of Armenia’s Integrated Finance Rehabilitation Plan (IFRP).&lt;span style=""&gt;  &lt;/span&gt;The IFRP was formulated in collaboration with the World Bank and the International Monetary Fund (IMF).&lt;span style=""&gt;  &lt;/span&gt;On the same day, Mr. Tasker wrote a letter to the accounting office of KPMG, with responsibility for auditing the financial statements of the MDP, requesting information about irregularities in the statement filed 2002.&lt;span style=""&gt;  &lt;/span&gt;The letter requested a meeting with Mr. A. Kuchukyan, Managing Director at KPMG, but Mr. Kuchukyan neither responded to the letter nor attended the requested meeting.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The Commission obtained procurement plans, works orders and consultancy schedules from the YWSC, which detailed the works which should have been carried out under the MDP, materials purchased and the use of consultants, which were contracted to supplement those included in the Operators staff rosters. A site trip to the Garni pumping station revealed that, although the Garni-Yerevan water supply system transfer had apparently been modified from a pumped to a gravity system, involving very costly materials, project engineering by contracted consultants and construction works; the works had not been carried out and the pumps continued to operate.&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Additional irregularities were subsequently found, including manipulation of the stated value of the company’s assets and personnel rosters that included employees who did not exist.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;In summary, through his work on the CGHA Commission, Mr. Tasker found that:&lt;/span&gt;&lt;/p&gt;  &lt;ul style="margin-top: 0cm;" type="disc"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;The PMU Director falsely represented the registration of the      PMU;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;A conflict of interests had been created in the person of Mr.      Richard Walkling;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Project objectives had been improperly altered;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Project targets had been improperly altered;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Project works had been accounted for and not implemented;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Deficient material had been used in the construction of a      reservoir;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Water meters had been purchased with project funds yet the      revenues went unrecorded;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;“Ghost” consultants had been extensively used;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Company accounts had been manipulated in annually audited      financial statements, resulting in the embezzlement of public funds –      through&lt;/span&gt;&lt;/li&gt;&lt;ul style="margin-top: 0cm;" type="circle"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;The transfer of an electricity debt to a public utility under       the IFRP;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Incorrectly stated and revalued company assets;&lt;/span&gt;&lt;/li&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span lang="EN-US"&gt;Incorrectly stated and inflated increase of company charter       capital.&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b style=""&gt;&lt;u&gt;&lt;span lang="EN-US"&gt;Chronology of Disclosure to the World Bank&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;It is important to note, that throughout these interactions with the ARIO, the YWSC and KPMG, the CGHA Commission and Mr. Tasker maintained an ongoing communication with Mr. Roger Robinson, the WBCM in &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;Armenia&lt;/st1:place&gt;&lt;/st1:country-region&gt;.&lt;span style=""&gt;  &lt;/span&gt;Despite these communications, no actions were taken by the World Bank Country Office, and as a result, in July, 2004, Mr. Tasker wrote to INT at World Bank Headquarters in &lt;st1:place st="on"&gt;&lt;st1:state st="on"&gt;Washington&lt;/st1:State&gt;&lt;/st1:place&gt; for advice about the difficulties with KPMG. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The Department of Institutional Integrity directs Bank staff and the public to report fraud and corruption in Bank operations.&lt;span style=""&gt;  &lt;/span&gt;INT defines this as “…[S]uspected contract irregularities and violations of the Bank's procurement guidelines; bid manipulation; bid collusion; coercive practices; fraudulent bids; fraud in contract performance; fraud in an audit inquiry; product substitution; price manipulation; substandard or inferior parts or materials; cost or labor mischarges; kickbacks, bribery or acceptance of gratuities; abuse of authority; misuse of Bank Group funds or funds entrusted to the Bank Group…”&lt;a style="" href="#_ftn1" name="_ftnref1" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[1]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Mr. Tasker’s disclosures cover virtually all of these categories of wrongdoing, but in a meeting held&lt;span style=""&gt; February 13&lt;sup&gt;th&lt;/sup&gt;, 2004, Mr. Robinson had not been cooperative. He advised Mr. Tasker that the MDP 6-month reviews prepared for the World Bank would not be provided by the Country Office to the Commission, which would have to apply to the PMU for them. &lt;span style=""&gt; &lt;/span&gt;At that point, Mr. Tasker informed him that the PMU was itself fraudulent, and it was only then that he agreed to cooperate with the Commission.&lt;span style=""&gt;  &lt;/span&gt;Mr. Robinson then agreed to provide the project documents requested for by the Commission, but informed Mr. Tasker that neither he nor the Commission should communicate directly with Bank headquarters in &lt;st1:place st="on"&gt;&lt;st1:state st="on"&gt;Washington&lt;/st1:State&gt;&lt;/st1:place&gt;.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;As cited above, Mr. Tasker documents that, on February13, 2004, he met with Mr. Robinson t&lt;/span&gt;&lt;span style="" lang="EN-US"&gt;o discuss the initial findings of the CGHA Commission.&lt;span style=""&gt;  &lt;/span&gt;He explained that the&lt;/span&gt;&lt;span lang="EN-US"&gt; MDPMU, designed to oversee the Development Credit Agreement, was not registered as a legal entity. Because the PMU should represent the Bank in the loan agreement with the Ministry of Finance (now Finance &amp; Economy) and the water utility (YWSE – now YWSC), the finding was especially significant.&lt;a style="" href="#_ftn2" name="_ftnref2" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[2]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt; &lt;span style=""&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Additionally, Mr. Tasker found a&lt;/span&gt;&lt;span style="" lang="EN-US"&gt; serious conflict of interests in the position of Mr. Richard Walkling and drew Mr. Robinson’s attention to this circumstance.&lt;span style=""&gt;  &lt;/span&gt;Mr. Tasker’s report of the meeting documents this disclosure (Annex 1).&lt;span style=""&gt;  &lt;/span&gt;In effect, &lt;/span&gt;&lt;span style="" lang="EN-US"&gt;Mr. Robinson was frequently informed via meetings, letters, and reports of Mr. Tasker’s findings.&lt;span style=""&gt;  &lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;It was at a meeting on the 24&lt;sup&gt;th&lt;/sup&gt; of February, that Mr. Tasker and the CGHA &lt;/span&gt;&lt;span lang="EN-US"&gt;Commission&lt;span style=""&gt; supplied the WBCM with a summary of the irregularities in the MDP (Annex 2).&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;On April 1&lt;sup&gt;st&lt;/sup&gt;, Mr. Robinson notified Mr. Hovhanessyan, the Head of the CGHA &lt;/span&gt;&lt;span lang="EN-US"&gt;Commission&lt;span style=""&gt;, that the appropriate technical and legal authorities at the World Bank had been informed of the problems with the MDP (Annex 3).&lt;span style=""&gt;  &lt;/span&gt;Mr. Tasker, however, is not aware that the CGHA &lt;/span&gt;Commission&lt;span style=""&gt; has ever been contacted by these Bank teams&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Approximately two months later, Mr. Hovhanessyan wrote to Mr. Robinson explaining that the CGHA &lt;/span&gt;&lt;span lang="EN-US"&gt;Commission&lt;span style=""&gt; was broadening the scope of its review of the MDP as a consequence of what appeared to be a widening range of corrupt activities associated with the Project.&lt;span style=""&gt;  &lt;/span&gt;Mr. Hovhanessyan wrote, “We have found what we believe to be several serious irregularities related to funds received by YWSC from the Government and the transfer of funds between the YWSC and other state organizations” (Annex 4).&lt;span style=""&gt;  &lt;/span&gt;This letter to Mr. Robinson was especially important as it emphasized to the responsible World Bank official that “[T]he improprieties could be part of a long established and ongoing process…”&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;In May and June, 2004, Mr. Tasker and the CGHA Commission attempted to work with the WBCM and officials from KPMG to clarify the financial statements provided by YWSC for the years 1996 to 2002.&lt;span style=""&gt;  &lt;/span&gt;These statements showed substantial discrepancies in the amounts paid by YWSC for electricity and for water meters.&lt;span style=""&gt;  &lt;/span&gt;The review, however, raised more questions than it answered, and Mr. Tasker set out these issues in a letter to KPMG dated June 23&lt;sup&gt;rd&lt;/sup&gt;.&lt;span style=""&gt;  &lt;/span&gt;From KPMG, no further information was forthcoming and on July 27&lt;sup&gt;th&lt;/sup&gt;, Mr. Tasker contacted the World Bank hot line for reporting fraud and corruption, established as part of the Bank’s Department of Institutional Integrity (INT).&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="color: black;" lang="EN-US"&gt;According to the Bank’s website:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="color: black;" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: 36pt;"&gt;&lt;span style="color: black;" lang="EN-US"&gt;The World Bank's Department of Institutional Integrity is mandated by the World Bank Group to investigate allegations of fraud and corruption in Bank Group operations as well as allegations of staff misconduct. The Integrity Department &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: 36pt;"&gt;&lt;span style="color: black;" lang="EN-US"&gt;reports its findings to senior management, who in turn decide what measures should be taken. In addition, the Integrity Department assists in preventative efforts to protect Bank Group funds, and those funds entrusted to it, from misuse and to deter fraud and corruption in its operations. The work of an investigative unit aids the World Bank in ensuring that funds are used for their intended purposes, thereby contributing to the organization's core mission of promoting development and reducing poverty.&lt;/span&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;On July 30&lt;sup&gt;th&lt;/sup&gt;, 2004, Mr. Tasker received a reply to the concerns he had raised.&lt;span style=""&gt;  &lt;/span&gt;In this communication, Mr. Yannick Stephant, the INT officer responsible for matters relating to Eastern Europe and &lt;st1:place st="on"&gt;Central Asia&lt;/st1:place&gt;, advised Mr. Tasker that his concerns regarding a fraudulent PMU, a conflict of interest in the person of the Director of the YWSC and the Armenian Ministry of Finance could best be addressed by contacting the PMU, the Director of the YWSC or the Ministry.&lt;span style=""&gt;  &lt;/span&gt;In other words, Mr. Stephant directed Mr. Tasker to obtain the information from the very individuals and offices that he had reported as complicit in the fraud.&lt;span style=""&gt;  &lt;/span&gt;Mr. Stephant wrote that, “Although this incident of non-disclosure of information (by KPMG) might be perceived as a lack of transparency, the withholding of such information might flow from contractual requirements.”&lt;span style=""&gt;  &lt;/span&gt;Despite the extensive documentation Mr, Tasker had revealed to Mr. Stephant and INT, the letter advised Mr. Tasker that, “Without additional information, we do not consider it as a case of fraud or corruption” (Annex 5).&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Despite the improbability of obtaining documentation from any of these sources, Mr. Tasker nonetheless contacted them.&lt;span style=""&gt;  &lt;/span&gt;When no further documentation was forthcoming, Mr. Tasker simply summarized the concerns the Commission had identified with respect to the awaited YWSC financial statement for 2003 and forwarded them to Mr. Walkling in a letter dated August 6&lt;sup&gt;th&lt;/sup&gt;. The letter was copied to Mr. Robinson (Annex 6).&lt;span style=""&gt;  &lt;/span&gt;There was no reply, and the CGHA Commission filed its Final Report in the National Assembly Archives.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;The website for INT states that:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: 36pt;"&gt;&lt;span style="" lang="EN-US"&gt;INT is responsible for ensuring a fair, prompt and thorough review of the facts and circumstances regarding reports of misconduct, and also for ensuring that the whistleblower is informed of the outcome of the Bank Group’s review or investigation into the matter, including whether misconduct has been substantiated and whether disciplinary measures, sanctions, or other remedial measures have been taken.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style="margin-left: 36pt;"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Mr. Tasker’s repeated attempts to address and correct fraud in the MDP in &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;Armenia&lt;/st1:place&gt;&lt;/st1:country-region&gt; by disclosures to INT and the Country Manager did not elicit an investigation of the central figure in the fraud.&lt;span style=""&gt;  &lt;/span&gt;He continues to operate with impunity.&lt;span style=""&gt;  &lt;/span&gt;Nor has there been a comprehensive review or investigation of Project operations by the Bank.&lt;span style=""&gt;  &lt;/span&gt;On the contrary, the World Bank completed an Implementation Completion Review in May, 2006 (Annex 7 includes Mr. Tasker’s annotated version of this report), nearly two years after Mr. Tasker’s report was completed, which concluded that the MDP had been successfully implemented.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b style=""&gt;&lt;u&gt;&lt;span style="" lang="EN-US"&gt;Chronology of Retaliation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b style=""&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;The Final Report of the CGHA Commission study into the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project, submitted by Mr. Tasker to Mr Hovhanessyan in September 2004,&lt;/span&gt;&lt;span lang="EN-GB"&gt; &lt;/span&gt;&lt;span lang="EN-US"&gt;was never presented to the National Assembly of Armenia, even though the term of the Commission was extended from October to December 2004, especially to facilitate completion of the study. &lt;span style=""&gt; &lt;/span&gt;We contend that the report was suppressed.&lt;span style=""&gt;  &lt;/span&gt;Further, Mr. Tasker’s efforts to correct corrupt practices detailed in the report have resulted in professional difficulties for him in &lt;st1:place st="on"&gt;&lt;st1:country-region st="on"&gt;Armenia&lt;/st1:country-region&gt;&lt;/st1:place&gt;.&lt;span style=""&gt;  &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;The World Bank maintains that its policies protect those who expose fraud and corruption in Bank operations from retaliation: “[T]&lt;/span&gt;&lt;span style="color: black;" lang="EN-US"&gt;the Bank expressly prohibits retaliation by a Bank staff member against any person, who, in good faith, reports suspected misconduct and will, as a consequence, take appropriate disciplinary action under Staff Rule 8.01.”&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Mr. Tasker has not enjoyed such protection.&lt;span style=""&gt;  &lt;/span&gt;He worked as a Foreign Public Official for a Parliamentary Commission, in response to a request from the Deputy Speaker of Parliament, who was Head of Commission. On the understanding that the Head of Commission wanted to take a stance against corruption, which has been escalating in &lt;st1:country-region st="on"&gt;&lt;st1:place st="on"&gt;Armenia&lt;/st1:place&gt;&lt;/st1:country-region&gt; through recent years, Mr. Tasker agreed to study the Municipal Development Project of the World Bank.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Wide-ranging corruption very soon became apparent and was reported to the various parties involved. The Commission included 9 members of parliament, including two from the majority Republican Party, one of whom, Mr. Melikyan, was the Deputy Head of Commission. These parliamentarians, when faced with the documents indicating corruption, pressured the Head of Commission to terminate the study. The Head of Commission is a senior member of a minority faction of the Government coalition, and was obliged to succumb to their demands.&lt;span style=""&gt;  &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;By the time this occurred, Mr. Tasker was involved in what had become a very unpleasant process. During the course of this process, the reluctance of the WBCM to correct obvious shortcomings in project implementation despite continuous expressions of support was clear.&lt;span style=""&gt;  &lt;/span&gt;Moreover, it is apparent now that Mr. Tasker has been “blacklisted” by the World Bank. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;On December 8&lt;sup&gt;th&lt;/sup&gt;, 2006, the Deputy Minister of Finance and Economy confirmed to Ms. Yelizaveta Sahakian, one of Mr. Tasker’s associates, that Mr. Tasker had been blacklisted by the Bank.&lt;span style=""&gt;  &lt;/span&gt;This warning followed a World-Bank financed workshop where Mr. Tasker was to have presented a water project.&lt;span style=""&gt;  &lt;/span&gt;Ms. Sahakian was told that no World Bank funded project involving Mr. Tasker would be considered for approval. &lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;According to INT, “Retaliation by a manager or other staff member against any person who reports suspected misconduct, or cooperates or provides information during an ensuing review or investigation, shall subject the manager or other staff member to disciplinary action under Staff Rule 8.01.”&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Mr. Tasker must therefore be extended the requisite protections under Staff Rule 8.01.&lt;span style=""&gt;  &lt;/span&gt;This rule ensures he will not suffer retaliation when bidding on future projects as a consequence of bringing to light claims of corruption.&lt;span style=""&gt;  &lt;/span&gt;&lt;/span&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;He is pursuing this action and claim because of the reprisal directed at him by the World Bank. During the years 2005 and 2006, the retaliation has virtually eliminated Mr. Tasker’s possibilities for the development of a project to which he and his associates have already committed considerable funds.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="color: black;" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b&gt;&lt;u&gt;&lt;span style="color: black;" lang="EN-US"&gt;Recommended Remedies&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;b&gt;&lt;u&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt;&lt;span style="text-decoration: none;"&gt; &lt;/span&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Prior to working on the Commission, Mr. Tasker had experienced excellent relations with many Government Ministers and other senior officials. He also had good working relations with the Country Manager and numerous specialists at the World Bank, all of whom knew of his interest in a major project to re-establish the Armenian sugar industry.&lt;a style="" href="#_ftn3" name="_ftnref3" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[3]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt; In 2000, in response to a request by the Minister of Trade and Industry, and with support letters from a number of other Ministers, as well as from the Armenian President, Mr. Tasker managed a study of the issues related to the re-establishment of the Armenian sugar industry.&lt;span style=""&gt;   &lt;/span&gt;Subsequently he attracted a USTDA grant to partially finance a feasibility study.&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Ethanol development is becoming a high priority for the Government of Armenia,&lt;a style="" href="#_ftn4" name="_ftnref4" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[4]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt; as supported by the World Bank, and Mr. Tasker’s team of specialists is well-placed to bid on agro-based renewable fuel and biogas-related Bank projects and contracts. The group is well known for expertise in the effort to re-establish the Armenian sugar industry, and&lt;/span&gt;&lt;span style="" lang="EN-US"&gt; &lt;/span&gt;&lt;span lang="EN-US"&gt;is ideally qualified for any project developed to promote ethanol production, based on the cultivation of sugar beets. Mr. Tasker’s group has submitted a comprehensive proposal to a World Bank financed fund, under the auspices of the office of the Prime Minister, which has been favorably received. The international team involved in the sugar project since 2002 includes international leaders in the latest ethanol and biogas technologies and their participation can be enormously beneficial to the Armenian economy in these spheres of activity.&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;ul style="margin-top: 0cm;" type="disc"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span style="" lang="EN-US"&gt;To rectify the harm caused      Mr. Tasker as a result of World Bank inaction with respect to his      disclosures of corruption, he respectfully demands that an external      monitor be named for the tender on the pending project, financed by the      World Bank, to develop an alternative fuel industry in Armenia to ensure      that Mr. Tasker and his associates’ bid is reviewed fairlyand alleviate      concerns regarding blacklisting.&lt;span style=""&gt;  &lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;In addition, through 2005 and 2006, &lt;/span&gt;&lt;span lang="EN-US"&gt;Mr. Tasker developed a critically important water project, based on information he gained through the study into the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Municipal Development Project. A Pilot Project was approved and has been implemented by the Spitak Development Association, a local fund for which Mr. Tasker is Project Director. The General Director of the Yerevan Water &amp; Sewerage Company, successor to Mr. Walkling, has sent the excellent results of the pilot project to the Head of the Armenian State Water Committee, who wrote to his Minister and recommended full project implementation. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;Through the year 2006 Mr Tasker sent a number of letters and messages to the World Bank in &lt;st1:state st="on"&gt;Washington&lt;/st1:State&gt; and in &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;, reporting on the excellent results of the Booster Pump Pilot Project. But in no case was there a response. After June 2006, the start date of work for Veolia, the new World Bank water utility operator in &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;, Mr. Tasker made several applications to Veolia’s General Director and Operations Director for a meeting to discuss the project. No meeting could be arranged. On 7&lt;sup&gt;th&lt;/sup&gt; December 2006 Mr. Tasker was to present the Booster Pump project to a fund workshop meeting and request a grant to finance implementation of the project, as agreed with the State Water Committee in May 2005. Therefore, in November 2006, Mr. Tasker sent full project details to Mr. Plezan, Operations Director, explaining that the Yerevan Water Company could receive new and efficient Booster Pumps, to replace &lt;st1:city st="on"&gt;&lt;st1:place st="on"&gt;Yerevan&lt;/st1:place&gt;&lt;/st1:City&gt;’s 500 old and inefficient booster pumps - free of charge. Again there was no response. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Mr. Walkling continues today to work as a consultant for Veolia, the Operator of the current World Bank water project for &lt;st1:place st="on"&gt;&lt;st1:city st="on"&gt;Yerevan&lt;/st1:City&gt;&lt;/st1:place&gt;.&lt;span style=""&gt;  &lt;/span&gt;Recently announced information from the Director of the present Yerevan Water Operator, indicates that Mr. Walkling is presently implementing the water project that Mr. Tasker developed with the Spitak Development Association.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;ul style="margin-top: 0cm;" type="disc"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span style="" lang="EN-US"&gt;We are therefore requesting      an immediate and independent investigation of the activities of Mr.      Walkling, an investigation that INT should have carried out two years      ago.&lt;span style=""&gt;  &lt;/span&gt;We also request prompt      information about the status and the findings of the investigation, in      compliance with the policies set out for INT in this regard.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;ul style="margin-top: 0cm;" type="disc"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span style="" lang="EN-US"&gt;In particular, we object to      Mr. Walkling’s management of the booster pump project developed and      piloted by Mr. Tasker. We are therefore also requesting Mr. Tasker be      recognized, in his capacity of Project Director of the &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;Spitak      Development Association&lt;/span&gt;&lt;span style="" lang="EN-US"&gt;, as author of the Booster Pump Project.&lt;span style=""&gt;  &lt;/span&gt;We contend that he has the right to      manage project implementation, including the right to apply for grant      funding, as was agreed with the Armenian &lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;State Water      Committee&lt;/span&gt;&lt;span style="" lang="EN-US"&gt;.&lt;/span&gt;&lt;a style="" href="#_ftn5" name="_ftnref5" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-GB"&gt;[5]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Finally, Mr. Tasker and his family have suffered considerable financial and psychological distress as a result of the pressures to which he was subject as a member of the CGHA Commission and the subsequent exclusion from consideration as a contractor by the Bank, the Government and foreign donors.&lt;span style=""&gt;  &lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;ul style="margin-top: 0cm;" type="disc"&gt;&lt;li class="MsoNormal" style=""&gt;&lt;span style="" lang="EN-US"&gt;We are therefore requesting      compensation for Mr. Tasker for the harm suffered over the course of the      period between when he left the CGHA Commission in December 2004, to the      date that this claim is resolved and compensation is paid in full. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;We appreciate your prompt response to this matter and look forward to hearing from you within the next ten business days.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span style="" lang="EN-US"&gt;Sincerely,&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;Karen Gray&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal"&gt;&lt;span lang="EN-US"&gt;General Counsel&lt;/span&gt;&lt;/p&gt;  &lt;div style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;br /&gt;  &lt;hr align="left" size="1" width="33%"&gt;  &lt;!--[endif]--&gt;  &lt;div style="" id="ftn1"&gt;  &lt;p class="MsoFootnoteText"&gt;&lt;a style="" href="#_ftnref1" name="_ftn1" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 10pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[1]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span lang="EN-US"&gt; Department of Institutional Integrity, “Reporting Fraud and Corruption,” www.worldbank.org.&lt;/span&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;div style="" id="ftn2"&gt;  &lt;p class="MsoNormal"&gt;&lt;a style="" href="#_ftnref2" name="_ftn2" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[2]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span lang="EN-US"&gt; &lt;/span&gt;&lt;span style="font-size: 10pt;" lang="EN-US"&gt;A study into the status of the PMU revealed that it was originally registered after the signing of the Subsidiary Loan Agreement and that the PMU stamp used on that agreement was counterfeit.&lt;span style=""&gt;  &lt;/span&gt;The MDPMU has since been re-registered and is now registered as a State Organization, a non-legal entity, under the auspices of the &lt;span style=""&gt;State Water Committee.&lt;span style=""&gt;  &lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoFootnoteText"&gt;&lt;span lang="EN-US"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;div style="" id="ftn3"&gt;  &lt;p class="MsoNormal"&gt;&lt;a style="" href="#_ftnref3" name="_ftn3" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 10pt;" lang="EN-US"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 10pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[3]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span style="font-size: 10pt;" lang="EN-US"&gt; The Armenian sugar industry was destroyed by the Spitak earthquake of 1988.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;div style="" id="ftn4"&gt;  &lt;p class="MsoFootnoteText"&gt;&lt;a style="" href="#_ftnref4" name="_ftn4" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 10pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[4]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span lang="EN-US"&gt; A renewable fuel substitute.&lt;/span&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;div style="" id="ftn5"&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;a style="" href="#_ftnref5" name="_ftn5" title=""&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span lang="EN-US"&gt;&lt;span style=""&gt;&lt;!--[if !supportFootnotes]--&gt;&lt;span class="MsoFootnoteReference"&gt;&lt;span style="font-size: 12pt; font-family: &amp;quot;Times New Roman&amp;quot;;" lang="EN-US"&gt;[5]&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/a&gt;&lt;span lang="EN-US"&gt; “&lt;/span&gt;&lt;span style="font-size: 10pt;" lang="EN-GB"&gt;In every way, we commit to support Spitak Development Association efforts to attract donor funding for the project and we will make every effort to attract the appropriate level of co-funding.”&lt;/span&gt;&lt;span style="" lang="EN-GB"&gt; &lt;/span&gt;&lt;span style="font-size: 10pt;" lang="EN-GB"&gt;- A.S.Andreasyan, Head of State Water Committee, in letter to the Spitak Development Association – 2&lt;sup&gt;nd&lt;/sup&gt; June 2005&lt;/span&gt;&lt;span style="font-size: 10pt;" lang="EN-GB"&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoNormal" style=""&gt;&lt;span style="font-size: 8pt;" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;p class="MsoFootnoteText"&gt;&lt;span style="" lang="EN-GB"&gt;&lt;o:p&gt; &lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;  &lt;/div&gt;  &lt;/div&gt;&lt;div class="blogger-post-footer"&gt;&lt;img width='1' height='1' src='https://blogger.googleusercontent.com/tracker/765123228200171826-3136590863763902960?l=to-suzanne-folsom-director-int.blogspot.com' alt='' /&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='http://to-suzanne-folsom-director-int.blogspot.com/feeds/3136590863763902960/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='http://www.blogger.com/comment.g?blogID=765123228200171826&amp;postID=3136590863763902960' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/3136590863763902960'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/765123228200171826/posts/default/3136590863763902960'/><link rel='alternate' type='text/html' href='http://to-suzanne-folsom-director-int.blogspot.com/2007/08/government-accountability-project.html' title=''/><author><name>Background</name><uri>http://www.blogger.com/profile/02868346754991859966</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='http://img2.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry></feed>
